GROUP COHESION
DYNAMIC
|
|
NAME:
|
LEAKING
PIPES from Poland
|
TIME:
|
20-30
min
|
LEVEL:
|
11
years old
|
MAIN
AIM:
|
solve
a challenge, teambuilding, assuming
roles
|
DESCRIPTION:
|
A group of 6 work as a team to solve a challenge. They have a
pipe with holes and at the bottom they have a message. They need to fill the
pipe with water to get the "duck" to the top so they could take it
out. The bucket of water is at some distance and they can only use a cup to
bring water. Students should not spill the water because they will not have
enough to fill the pipe. They have to close the holes well with their fingers
in order not to lose water. They should choose water carriers and those who
close the holes in the pipe.
|
MATERIAL:
|
You need a plastic pipe
about 10 cm in diameter and 1 m long. Cover on one side. Drill 12-15 holes.
One egg surprise - inside plastic egg to put a message inside or just
something small that will float on water (a "duck"); a bucket of
water – enough to fill the pipe with water plus some extra, 2 cups.
|
OBSERVATIONS:
|
You
do not say they need to hurry, but when you ask them to start at the same
time they automaticaly compete with other teams. It is good to give some time
to plan before.
|
GROUP:
|
6
groups of 6
|
DATE:
|
16-05-2016
|
GOOD POINTS:
|
It
was a lot of fun.
|
WEAK POINTS:
|
Some
children got completely wet. If you give just one bucket of water some
students may not be able to complete the activity because they may lose the
water during the struggle.
|
OTHER COMMENTS / SUGGESTIONS
|
You
may give a choice of 1 or 2 cups. The group will have to decide a better
solution for them – one cup and more fingers to close holes or go faster with
2 cups and have less people to close the holes. You may let them change
during the task.
|
Τετάρτη 27 Ιουλίου 2016
Leaking pipes from Poland
Εγγραφή σε:
Σχόλια ανάρτησης (Atom)
Δεν υπάρχουν σχόλια:
Δημοσίευση σχολίου